Construction 3 Lacs inc.

Service · Vaudreuil-Soulanges and the West Island

Bathroom renovation

A bathroom rebuilt from floor to ceiling, with one person accountable for the plumbing, electrical, tile and finishing. Delivered clean, in 2 to 4 weeks.

Or call: 514-444-2391

What is included

Everything below is in the written quote, line by line. Nothing is a surprise on the invoice.

  • Demolition and disposal
  • Walk-in shower or tub-shower, base and waterproofing membrane
  • Electric heated floor under the tile
  • Wall and floor tile, epoxy grout on request
  • Vanity, fixtures, toilet, mirror and lighting
  • Plumbing and electrical by licensed masters, coordinated by us

From our job sites

Real projects, photographed by our crew in Vaudreuil-Soulanges and the West Island.

See all our work

How it goes

From the first call to the handover

  1. Visit and measurements

    We check the subfloor, ventilation and existing plumbing before pricing anything.

  2. Material selection

    Tile, vanity, fixtures: we point you to local suppliers and order everything before demolition starts.

  3. Construction

    Demolition, plumbing, electrical, membrane, tile, finishing. Only one bathroom? We schedule to keep the days without a shower to a minimum.

  4. Final walkthrough

    We test every tap and drain with you, and clean up before we leave.

What it costs

A complete 50 sq ft bathroom lands in these ranges depending on the finish level, taxes included. Relocated plumbing and demolition are added on top.

Standard

Quality materials, common finishes

$16,499to$23,742

50 sq ft, taxes included

Premium

High-end finishes, quartz, glass

$21,449to$30,865

50 sq ft, taxes included

Luxury

Custom work, premium materials

$28,048to$40,362

50 sq ft, taxes included

References based on Québec market prices (about $350/sq ft in the standard tier). The firm price is confirmed in writing after a free visit.

Try the online estimator

Questions homeowners ask

Before starting a bathroom renovation project with us.

How long will I be without a bathroom?

Plan for 2 to 4 weeks of work. The toilet is usually put back in service each evening, and the shower is out of use for about 10 days while the membrane and tile go in.

Do I need a permit to renovate a bathroom?

If plumbing is moved or a wall is changed, most towns in Vaudreuil-Soulanges require a permit. We check with your municipality and prepare the paperwork with you.

Can I convert my tub into a walk-in shower?

Yes, it is our most common request. We keep the existing drain when possible, otherwise the plumber relocates it. Plan for a custom base and a full membrane.

Is a heated floor expensive to run?

No. A bathroom heated floor on a programmable thermostat draws very little, and it is the comfort feature clients least regret.

Where we do this work

Based in Vaudreuil-Dorion. Each town has its own page with the local rules and the type of houses we see there.

Your town is not listed? We also work across the West Island (Pointe-Claire, Kirkland, Dollard-des-Ormeaux, Pierrefonds, Beaconsfield, Sainte-Anne-de-Bellevue), in Châteauguay, Vaudreuil-sur-le-Lac and everywhere in Vaudreuil-Soulanges. The visit is still free.

Tell us about your project

Call, write or send the form to discuss your project.

  1. 1. We call you backTo understand the project and set the visit.
  2. 2. Free visitWe measure and check site conditions.
  3. 3. Written quoteDetailed, line by line, no obligation.
How would you prefer to be contacted?

Free visit and quoteRBQ licence 5788-4918-01

Your contact details are used to respond to your request.

CallFree quote